HOW TO APPLY BUILDING, ELECTRICAL, PLUMBING AND MECHANICAL (FOR COMMERCIAL BUILDING WITHIN THE BEACH RESORT DEVELOPMENT)

Parent Category: ROOT Category: Basic Services

ISSUANCE OF PERMITS (BUILDING, ELECTRICAL, PLUMBING AND MECHANICAL)

FOR COMMERCIAL BUILDING WITHIN THE BEACH RESORT DEVELOPMENT.

  • Who May Avail of the Service: Any person, firm, or corporation including any agency or instrumentality of the government who intend to construct a building/structure
  • Where to Transact: Building & Industrial Safety Section, City Engineer’s Office
  • Person In-charge:  Engr. Darwin S. Arig - City Engineer

What are the Requirements:

 

Clearance/Certification:

  • Barangay Construction Clearance
  • Barangay Construction Clearance
  • Zoning Certification
  • Locational Clearance
  • Mayor’s Certification
  • Fire Safety Certification
  • Environmental Compliance Certificate (ECC)
  • Foreshore lease                       

If the applicant is the owner of the lot:

  • Land Title (Photocopy)                                                             
  • Latest Tax Declaration (Photocopy)                                           
  • Latest Tax Clearance (Photocopy)                                                                                                                                            

If the applicant is not the owner of the lot:                               

  • Deed of Sale (Photocopy)                                                        
  • Deed of Donation (Photocopy)                                                 
  • Extrajudicial Partition (Photocopy)                                            
  • Lot Owner’s Consent (Notarized)                                                                                                                                                                     

Plans:

  1. Building Plan Signed and Sealed by Civil Engineer/Architect
  2. Electrical Plan Signed and Sealed by Professional Electrical Engineer
  3. Plumbing Plan Signed and Sealed by Master Plumber/Sanitary Engineer
  4. Mechanical Plan Signed and Sealed by Professional Mechanical Engineer
  5. Bill of Materials and Cost Estimate Signed and Sealed by Civil Engineer/Architect
  6. Structural Design and Analysis (additional requirements if the building is 2 storey above) Signed and Sealed by Civil Engineer
  7. Specification Signed and Sealed by Civil Engineer/Architect

Fees: It is based on the revised IRR of PD1096 National Building Code of the Philippines

Duration: Three (3) working days

Schedule of Availability of Service:

Monday – Friday

8:00am – 5:00pm; no noon break

 

How to Avail the Service:

Step

What To Do

To Whom

Action To Take

1

Submit the application with the complete requirements and wait while the documents are being evaluated.

Anyone of the following:

Engr. Alexander R. Rulete

Building Inspector

 

Aquilino C. Batindaan

Building Inspector

 

Ricky A. Calago

Building Inspector

Ø Receive and evaluate the application as to completeness of the requirements.

If incomplete, return the documents to the applicant.

2

 

Engr. Eric C. Palacio

Engr. Alexander R.  Rulete

Engr. Alexander R.  Rulete

Engr. Alexander R.  Rulete

Aquilino C. Batindaan

Aquilino C. Batindaan

Engr. Samson C. Corpuz

Ø Receive and record the application and advise the applicant to follow-up within 2days. The application is subject for detailed evaluation as to the following aspect.

  1. Line & Grade
  2. Land Use & Zoning
  3. Architectural
  4. Structural
  5. Sanitary
  6. Electrical
  7. Mechanical

3

If no error in the plans & specs, the document is subject for final assessment of fees.

Anyone of the following:

Engr. Alexander R. Rulete

Building Inspector

 

Aquilino C. Batindaan

Building Inspector

 

Ricky A. Calago

Building Inspector

 

Arman A. Aquino

Electrical Inspector II

 

Anastacio R. Alcantara

Electrical Inspector II

Ø Assessment of Fees

 

4

Pay at City Treasurer’s Office and submit the Official Receipt to the Building & Industrial Safety Section

 

Anyone of the following:

Engr. Alexander R. Rulete

Building Inspector

 

Aquilino C. Batindaan

Building Inspector

 

Ricky A. Calago

Building Inspector

 

Arman A. Aquino

Electrical Inspector II

 

Anastacio R. Alcantara

Electrical Inspector II

 Ø Receive and record the official receipt

 

5

 

Engr. Alexander R. Rulete

Building Inspector

Ø Final review and recommendation for Approval to the Building Official

6

 

Engr. Darwin S. Arig

City Engineer

Ø Approval

7

Receive the owner’s copy and signify in the logbook.

Anyone of the following:

Engr. Alexander R. Rulete

Building Inspector

 

Aquilino C. Batindaan

Building Inspector

 

Ricky A. Calago

Building Inspector

 

Arman A. Aquino

Electrical Inspector II

 

Anastacio R. Alcantara

Electrical Inspector II

Ø Receive, record, number and release the approved permit.