HOW TO APPLY BUILDING, ELECTRICAL, PLUMBING AND MECHANICAL (FOR COMMERCIAL BUILDING)

Created: 10 November 2015 Published Date Hits: 1166

ISSUANCE OF PERMITS (BUILDING, ELECTRICAL, PLUMBING AND MECHANICAL)

FOR COMMERCIAL BUILDING

Who May Avail of the Service:

Any person, firm, or corporation including any agency or instrumentality of the government who intend to construct a building/structure

 

Where to Transact: Building & Industrial Safety Section, City Engineer’s Office

 

Person In-charge:            Engr. Darwin S. Arig

                                       City Engineer

 

What are the Requirements:

  • Clearances/Certifications:
    • Barangay Construction Clearance
    • Zoning Certification
    • Locational Clearance
    • Mayor’s Certification
    • Fire Safety Certification
  •  If the applicant is the owner of the lot
    • Land Title (Photocopy)                                                                   
    • Latest Tax Declaration (Photocopy)                                                 
    • Latest Tax Clearance (Photocopy) or Official Tax Receipt                       
  • If the applicant is not the owner of the lot ( any of the following)                                                                   
    • Deed of Sale (Photocopy)                                                              
    • Deed of Donation  (Photocopy)                                                                                        
    • Extrajudicial Partition (Photocopy)                                                                                                     
    • Lot Owner’s Consent (Notarized)                                                                                                                                                                    
  •  Plans: (Duly accomplished application Form)
    1. Building Plan Signed and Sealed by Civil Engineer/Architect
    2. Electrical Plan Signed and Sealed by Professional Electrical Engineer
    3. Plumbing Plan Signed and Sealed by Master Plumber/Sanitary Engineer
    4. Mechanical Plan Signed and Sealed by Professional Mechanical Engineer
    5. Bill of Materials and Cost Estimate Signed and Sealed by Civil Engineer/Architect
    6. Structural Design and Analysis (additional requirements if the building is 2 storeys  above) Signed and Sealed by Civil Engineer
    7. Specification Signed and Sealed by Civil Engineer/Architect
  • Fees: It is based on the revised IRR of PD1096 National Building Code of the Philippines
  • Duration: Three (3) working days

Schedule of Availability of Service:

Monday – Friday

8:00am – 5:00pm; no noon break

 

How to Avail the Service:

Step

What To Do

To Whom

Action To Take

1

Submit the application with the complete requirements and wait while the documents are being evaluated.

Anyone of the following:

Engr. Alexander R. Rulete

Building Inspector

 

Aquilino C. Batindaan

Building Inspector

 

Ricky A. Calago

Building Inspector

Ø Receive and evaluate the application as to completeness of the requirements.

If incomplete, return the documents to the applicant

2

 

Engr. Eric C. Palacio

Engr. Alexander R.  Rulete

Engr. Alexander R.  Rulete

Engr. Alexander R.  Rulete

Aquilino C. Batindaan

Aquilino C. Batindaan

Engr. Samson Corpuz

Ø Receive and record the application and advise the applicant to follow-up within 2days. The application is subject for detailed evaluation as to the following aspect.

  1. Line & Grade
  2. Land Use & Zoning
  3. Architectural
  4. Structural
  5. Sanitary
  6. Electrical
  7. Mechanical

3

 

 

 

Anyone of the following:

Engr. Alexander R. Rulete

Building Inspector

 

Aquilino C. Batindaan

Building Inspector

 

Ricky A. Calago

Building Inspector

Ø Assessment of Fees

 

4

Pay at City Treasurer’s Office and submit the Official Receipt to the Building & Industrial Safety Section

 

Anyone of the following:

Engr. Alexander R. Rulete

Building Inspector

 

Aquilino C. Batindaan

Building Inspector

 

Ricky A. Calago

Building Inspector

 

Arman A. Aquino

Electrical Inspector II

 

Anastacio R. Alcantara

Electrical Inspector II

 Ø Receive and record the official receipt

 

5

 

Engr. Alexander R. Rulete

Building Inspector

Ø Final review and recommendation

6

 

Engr. Darwin S. Arig

City Engineer

Ø Approval

7

Receive the owner’s copy of building permit and signify in the logbook.

Any of the following:

Engr. Alexander R. Rulete

Building Inspector

 

Aquilino C. Batindaan

Building Inspector

 

Ricky A. Calago

Building Inspector

 

Arman A. Aquino

Electrical Inspector II

 

Anastacio R. Alcantara

Electrical Inspector II

Ø Receive, record, number and release the approved building permit.

 

 

 

 

Log-in